Liquefying natural gas and delivering it to customers across Asia.
Overview
Tanjung Api, our two-train liquefaction plant, turns gas from our offshore hubs into LNG for utilities and buyers across Asia. It delivered 58 cargoes in FY2025.
Tanjung Api has a nameplate capacity of 4.2 million tonnes a year across two trains. In FY2025 the plant delivered 58 cargoes, or 4.1 million tonnes, with a reliability of 97 percent.
Most volumes are sold under long-term contracts with utilities in North Asia. The balance is placed on the spot and short-term market by our trading desk in Kuala Lumpur, which lets us capture value when prices move.
LNG will remain a core part of Asia's energy mix as economies shift away from coal. We are studying debottlenecking options at Tanjung Api that would add capacity without a new train.
- Nameplate capacity
- 4.2 mtpa
- Cargoes, FY2025
- 58
- Volume delivered
- 4.1 mt
- Plant reliability
- 97%
FY2025
LNG in numbers
- Revenue
- RM 10.6 bn25.0% of group
- EBITDA
- RM 4.3 bn26% of group
- Capital expenditure
- RM 1.1 bn13% of group
- Nameplate capacity
- 4.2 mtpa
Strategy
Our priorities
Run reliably
Planned maintenance on one train at a time, so the plant never stops loading.
Keep the portfolio balanced
Long-term contracts for most volumes, with a flexible share for the spot market.
Debottleneck before building
Studies under way to add capacity within the existing plant footprint.
Operations
Our assets today
Operating status is updated by our operations team as it changes.
- Online 1 asset
- Maintenance 0 assets
- Ramp-up 0 assets
Tanjung Api LNG
OnlineBoth trains running. Train 1 minor maintenance planned for January 2027.
- Type
- Liquefaction plant, two trains
- Capacity
- 4.2 mtpa
- Location
- East Malaysia
- Interest
- 65%, operator
Updated 20 September 2026