Skip to content
Demo site built by Hanastudio. Sample content.Back to Hanastudio

Operations

Where we operate, and how each asset is running

Nine assets across Malaysia and Southeast Asia. Status is updated by our operations team whenever an asset goes into planned maintenance, ramps up or returns to service.

Industrial control room with instrument panels and a central operator desk

01

Upstream

  • Online 3 assets
  • Maintenance 1 asset
  • Ramp-up 0 assets
  • Laut Dalam

    Online

    On plateau. Phase 2 sanctioned in March 2026, first gas expected in 2029.

    Type
    Offshore gas cluster
    Capacity
    186 kboe/d
    Location
    Offshore East Malaysia
    Interest
    70%, operator

    Updated 15 September 2026

  • Tukun Perak

    Online

    Three platforms and a central processing hub. Infill drilling campaign under way.

    Type
    Offshore gas and condensate
    Capacity
    98 kboe/d
    Location
    Offshore Peninsular Malaysia
    Interest
    60%, operator

    Updated 10 September 2026

  • Selat Hujan

    Maintenance

    Planned turnaround started 8 September 2026. Return to production expected in November 2026.

    Type
    Offshore oil
    Capacity
    64 kboe/d
    Location
    Offshore Peninsular Malaysia
    Interest
    100%, operator

    Updated 8 September 2026

  • Partner-operated interests

    Online

    Seven producing licences operated by partners.

    Type
    Non-operated oil and gas
    Capacity
    64 kboe/d
    Location
    Southeast Asia
    Interest
    15% to 40%

    Updated 31 August 2026

02

LNG

  • Online 1 asset
  • Maintenance 0 assets
  • Ramp-up 0 assets
  • Tanjung Api LNG

    Online

    Both trains running. Train 1 minor maintenance planned for January 2027.

    Type
    Liquefaction plant, two trains
    Capacity
    4.2 mtpa
    Location
    East Malaysia
    Interest
    65%, operator

    Updated 20 September 2026

03

Refining

  • Online 1 asset
  • Maintenance 0 assets
  • Ramp-up 0 assets
  • Pulau Kering refinery

    Online

    Running at 91 percent utilisation. Next major turnaround in Q2 2027.

    Type
    Crude oil refinery
    Capacity
    120 kbbl/d
    Location
    Peninsular Malaysia, west coast
    Interest
    100%, operator

    Updated 18 September 2026

04

Low carbon

  • Online 1 asset
  • Maintenance 0 assets
  • Ramp-up 2 assets
  • Suria solar portfolio

    Online

    Five operating sites selling power under long-term agreements.

    Type
    Utility-scale solar, five sites
    Capacity
    620 MW
    Location
    Peninsular Malaysia
    Interest
    100%

    Updated 1 September 2026

  • Ladang Suria

    Ramp-up

    First power in April 2026. Full output expected by December 2026.

    Type
    Utility-scale solar
    Capacity
    180 MW
    Location
    Peninsular Malaysia
    Interest
    100%

    Updated 12 September 2026

  • Ayer Tenang CCS pilot

    Ramp-up

    Injection rates increasing in steps while reservoir monitoring continues.

    Type
    Carbon capture and storage
    Capacity
    0.2 mtpa
    Location
    East Malaysia
    Interest
    100%, operator

    Updated 5 September 2026

Capacities are nameplate or FY2025 average production, net to Haldrica's interest where stated. Planned maintenance is included in our annual production guidance.