Skip to content
Demo site built by Hanastudio. Sample content.Back to Hanastudio

What we do · 04

Low carbon

Building a renewable power and carbon capture business.

Rows of solar panels on trackers under a wide blue sky

Overview

Our low-carbon business develops solar power and carbon capture and storage. It has 800 megawatts of solar capacity and a capture pilot at Ayer Tenang, and received 11 percent of group capital expenditure in FY2025.

We have 800 megawatts of solar capacity: 620 megawatts operating across five sites in Peninsular Malaysia and 180 megawatts at Ladang Suria, which delivered first power in April 2026 and reaches full output by the end of the year.

At Ayer Tenang we operate a pilot that captures carbon dioxide from gas processing and stores it in a depleted reservoir, with capacity for 0.2 million tonnes a year. The pilot informs the design of a larger storage hub.

The business is small today, at 0.5 percent of group revenue. We plan to raise its share of capital expenditure to 20 percent by 2030 and to reach 3 gigawatts of renewable capacity in the same year.

Solar capacity
800 MW
Target by 2030
3 GW
Capture pilot
0.2 mtpa
Share of group capex
11%

FY2025

Low carbon in numbers

Revenue
RM 0.2 bn0.5% of group
EBITDA
RM 0.1 bn1% of group
Capital expenditure
RM 0.9 bn11% of group
Solar capacity
800 MW

Strategy

Our priorities

  1. Scale solar

    A pipeline of utility-scale sites to take capacity from 800 megawatts to 3 gigawatts by 2030.

  2. Prove storage

    Monitoring at Ayer Tenang to show the reservoir holds carbon dioxide safely over time.

  3. Fund it from the core

    Low-carbon investment paid for by upstream cash flow, within our capital framework.

Operations

Our assets today

Operating status is updated by our operations team as it changes.

All operations
  • Online 1 asset
  • Maintenance 0 assets
  • Ramp-up 2 assets
  • Suria solar portfolio

    Online

    Five operating sites selling power under long-term agreements.

    Type
    Utility-scale solar, five sites
    Capacity
    620 MW
    Location
    Peninsular Malaysia
    Interest
    100%

    Updated 1 September 2026

  • Ladang Suria

    Ramp-up

    First power in April 2026. Full output expected by December 2026.

    Type
    Utility-scale solar
    Capacity
    180 MW
    Location
    Peninsular Malaysia
    Interest
    100%

    Updated 12 September 2026

  • Ayer Tenang CCS pilot

    Ramp-up

    Injection rates increasing in steps while reservoir monitoring continues.

    Type
    Carbon capture and storage
    Capacity
    0.2 mtpa
    Location
    East Malaysia
    Interest
    100%, operator

    Updated 5 September 2026