Sustainability ·
Ladang Suria solar park delivers first power
The 180 megawatt park takes Haldrica's solar capacity to 800 megawatts and reaches full output by the end of 2026.
Ladang Suria, Haldrica's largest solar park to date, has delivered first power to the grid. The 180 megawatt park will ramp up in stages and is expected to reach full output by December 2026.
With Ladang Suria, Haldrica's solar capacity reaches 800 megawatts, alongside 620 megawatts already operating across five sites in Peninsular Malaysia.
The group aims to reach 3 gigawatts of renewable capacity by 2030 and to raise the share of capital expenditure in low-carbon businesses to 20 percent.